← Back to home

Driving to Mt. Rose

Mt. Rose Ski Tahoe sits on NV-431 about 25 miles southwest of Reno, on the Reno side of Mt. Rose Summit, the highest year-round highway pass in the Sierra at ~8,911 ft. The direct climb from Reno reaches the resort without crossing the pass; every approach from the lake side crosses it, so a summit closure cuts off the long way round through Truckee and Incline Village and leaves the Reno climb as the way in.

Routes to Mt. Rose

Mt Rose Route NV-431 from Reno via Mt. Rose Highway

The direct approach from Reno and Sparks: Mt. Rose Highway (NV-431) up to the resort, about 30 to 40 minutes in good conditions. The upper climb is steep and wind-exposed and there is no fuel on the way, but the resort comes before the summit, so this route never crosses the pass. NDOT traction rules apply; this is usually the first North Tahoe Nevada road to post chains.

Mt Rose Route live status →
Reno Route I-80 from Reno & Sparks via Hwy 267 and NV-28 when 431 is closed

The Reno-side alternate when the climb from Reno is closed or held: I-80 west to Truckee, Hwy 267 over Brockway Summit (~7,179 ft), NV-28 through Kings Beach to Incline Village, then NV-431 up over Mt. Rose Summit and down to the resort. Much longer than the direct climb (often 1.5 to 2 hours in good conditions), and no help when the summit itself is closed; then the direct climb is the way in.

Reno Route live status →
Donner Route I-80 from Sacramento & the Bay Area via Donner Summit and Hwy 267

From Sacramento and the Bay Area: I-80 over Donner Summit to Truckee, then the same Brockway → NV-28 → 431 finish as the Reno alternate, about 3 to 3.5 hours from Sacramento in good conditions. Three named summits on one drive (Donner, Brockway, Mt. Rose); any one of them can be the holdup.

Donner Route live status →
Truckee Route Hwy 267 from Truckee via Brockway Summit and NV-431

For drivers starting in Truckee: Hwy 267 over Brockway Summit, NV-28 to Incline, then 431 over Mt. Rose Summit to the resort, about 45 to 60 minutes in good conditions. Skips Donner Summit; still depends on Brockway and on the Mt. Rose summit climb from the Incline side.

Truckee Route live status →

The times above assume clear roads. In storms, chain controls, plow pacing, and closures can multiply them several times over: a drive that takes 3 hours on a clear day can take 8 or more on a bad one.

Passes to know

Mt. Rose Summit~8,911 ft Highest year-round Sierra highway pass, just past the resort; crossed by every approach from the lake side, never by the direct Reno climb; first to chain, often first to close
Brockway Summit~7,179 ft Hwy 267 between Truckee and Kings Beach; on every approach from the lake side
Donner Summit~7,056 ft I-80 gate for the California Donner Route only; irrelevant to the direct Reno climb

Winter driving to Mt. Rose

Before you go